1,500 Projet de traitement du cuivre t/d en Mongolie

Cas de projets / 1,500 Projet de traitement du cuivre t/d en Mongolie

The Mongolia copper-ore project is configured for 1,500 tonnes per day. Its process connects staged crushing and screening with wet grinding, classification, flotation and concentrate dewatering, keeping ore preparation and mineral separation within one processing route.

Project Configuration

Matériel, throughput and process arrangement
EmplacementMongolia
MatérielCopper ore
Project configuration1,500 t/jour
Grinding arrangementWet grid-type ball mill with classification
Separation routeFlottation
Concentrate handlingThickening followed by filter-press dewatering

Processing Stages

1. Crushing and screening

Jaw and cone crushing reduce the ore, with screening controlling the material sent forward to grinding.

2. Wet grinding and classification

A wet grid-type ball mill works with pre-classification and a hydrocyclone group. The classification section controls the grinding stream before flotation.

3. Flottation

The flotation arrangement includes roughing, scavenging and cleaning duties. These stages separate copper-bearing material from the prepared slurry.

4. Concentrate dewatering

Thickening forms the first concentrate-dewatering stage. Filter pressing then produces a filter cake for subsequent handling.

Project Equipment

Personnel inspecting the gear and drive side of an industrial grinding mill
Drive-side inspection of grinding equipment.

The grinding section cannot be evaluated independently of the flotation feed it produces. In this configuration, classification connects particle-size reduction with mineral separation, while the thickener and filter press handle the concentrate after flotation.

Related capabilities: Équipement de meulage, équipement de séparation des minéraux et le Installations de fabrication de Vanore.

Equipment Roles Across the Line

Equipment and process responsibilities
ScèneÉquipementProcess role
Ore preparationTour de concasseur, cone crusher and équipement de dépistagePrepare a controlled grinding feed.
AffûtageWet ball millReduce particle size before mineral separation.
ClassificationPre-classification screen and hydrocyclone groupControl the grinding stream ahead of flotation.
SéparationFlotation equipmentProvide roughing, scavenging and cleaning stages.
Concentrate handlingThickener and filter pressRemove water from the flotation concentrate.

Discuss Your Copper Processing Requirements

Share your ore characteristics, daily throughput, available testwork and required equipment scope. These details help our team review the grinding, separation and supporting stages for your project.

E-mail: info@vanoremining.com
WhatsApp: +86 18703806100

Nom et prénom