300 t/d Gold Processing Project in Suriname

Project cases / 300 t/d Gold Processing Project in Suriname

This gold-ore project in Suriname brings together ore washing, staged crushing, closed-circuit grinding and gold recovery. The original project configuration is 300 tonnes per day, with classification linking the grinding section to downstream leaching and adsorption.

Project Configuration

Material, throughput and process arrangement
LocationSuriname
MaterialGold ore
Original project configuration300 t/day
PreparationWashing, crushing and grinding
Recovery routeLeaching and adsorption
Tailings handlingFilter-press dewatering and water return

Processing Stages

1. Ore preparation

Washing and crushing prepare the ore for milling. Jaw and cone crushing reduce the feed before it enters the grinding section.

2. Grinding and classification

The ball mill and classification equipment form a closed circuit. Material requiring further size reduction returns to grinding, while the classified slurry continues toward recovery.

3. Gold recovery

The recovery section includes leaching, adsorption and downstream gold recovery equipment. Preparation and slurry transfer connect these stages with the grinding circuit.

4. Tailings and water

Filter-press dewatering separates water from the tailings. Return water is recycled within the processing arrangement.

Project Equipment

Gold processing installation with classification and slurry transfer equipment in Suriname
Classification and slurry-transfer equipment within the Suriname gold processing installation.

The project illustrates how a daily-throughput requirement translates into connected equipment stages rather than a single machine. Washing, crushing, grinding, recovery and tailings handling each have a separate duty. Matching these interfaces is central to a coordinated processing line.

Related capabilities: Gold processing equipment, mineral processing systems and the Vanore manufacturing facilities.

Equipment Roles Across the Line

Equipment and process responsibilities
StageEquipmentProcess role
CrushingJaw crusher and cone crusherReduce ore size ahead of the grinding stage.
GrindingBall millGrind prepared ore before classification and recovery.
ClassificationClassifier and hydrocycloneSeparate the grinding stream and route material through the closed circuit.
RecoveryLeaching tanks and adsorption equipmentConnect slurry preparation with the gold recovery section.
TailingsFilter pressDewater tailings and support water return.