Project cases / 300 t/d Gold Processing Project in Suriname
This gold-ore project in Suriname brings together ore washing, staged crushing, closed-circuit grinding and gold recovery. The original project configuration is 300 tonnes per day, with classification linking the grinding section to downstream leaching and adsorption.
Project Configuration
| Location | Suriname |
|---|---|
| Material | Gold ore |
| Original project configuration | 300 t/day |
| Preparation | Washing, crushing and grinding |
| Recovery route | Leaching and adsorption |
| Tailings handling | Filter-press dewatering and water return |
Processing Stages
1. Ore preparation
Washing and crushing prepare the ore for milling. Jaw and cone crushing reduce the feed before it enters the grinding section.
2. Grinding and classification
The ball mill and classification equipment form a closed circuit. Material requiring further size reduction returns to grinding, while the classified slurry continues toward recovery.
3. Gold recovery
The recovery section includes leaching, adsorption and downstream gold recovery equipment. Preparation and slurry transfer connect these stages with the grinding circuit.
4. Tailings and water
Filter-press dewatering separates water from the tailings. Return water is recycled within the processing arrangement.
Project Equipment

The project illustrates how a daily-throughput requirement translates into connected equipment stages rather than a single machine. Washing, crushing, grinding, recovery and tailings handling each have a separate duty. Matching these interfaces is central to a coordinated processing line.
Related capabilities: Gold processing equipment, mineral processing systems and the Vanore manufacturing facilities.
Equipment Roles Across the Line
| Stage | Equipment | Process role |
|---|---|---|
| Crushing | Jaw crusher and cone crusher | Reduce ore size ahead of the grinding stage. |
| Grinding | Ball mill | Grind prepared ore before classification and recovery. |
| Classification | Classifier and hydrocyclone | Separate the grinding stream and route material through the closed circuit. |
| Recovery | Leaching tanks and adsorption equipment | Connect slurry preparation with the gold recovery section. |
| Tailings | Filter press | Dewater tailings and support water return. |
Discuss Your Gold Processing Requirements
Share your ore characteristics, daily throughput, available testwork and required equipment scope. These details help our team review the grinding, separation and supporting stages for your project.
Email: info@vanoremining.com
WhatsApp: +86 18703806100
