1,500 مشروع معالجة النحاس بالطن/اليوم في منغوليا

حالات المشروع / 1,500 مشروع معالجة النحاس بالطن/اليوم في منغوليا

The Mongolia copper-ore project is configured for 1,500 طن يوميا. Its process connects staged crushing and screening with wet grinding, تصنيف, flotation and concentrate dewatering, keeping ore preparation and mineral separation within one processing route.

تكوين المشروع

مادة, الإنتاجية وترتيب العملية
موقعمنغوليا
مادةخام النحاس
تكوين المشروع1,500 ر / يوم
Grinding arrangementWet grid-type ball mill with classification
Separation routeالتعويم
Concentrate handlingThickening followed by filter-press dewatering

مراحل المعالجة

1. Crushing and screening

Jaw and cone crushing reduce the ore, with screening controlling the material sent forward to grinding.

2. Wet grinding and classification

A wet grid-type ball mill works with pre-classification and a hydrocyclone group. The classification section controls the grinding stream before flotation.

3. التعويم

The flotation arrangement includes roughing, scavenging and cleaning duties. These stages separate copper-bearing material from the prepared slurry.

4. Concentrate dewatering

Thickening forms the first concentrate-dewatering stage. Filter pressing then produces a filter cake for subsequent handling.

معدات المشروع

Personnel inspecting the gear and drive side of an industrial grinding mill
Drive-side inspection of grinding equipment.

The grinding section cannot be evaluated independently of the flotation feed it produces. In this configuration, classification connects particle-size reduction with mineral separation, while the thickener and filter press handle the concentrate after flotation.

القدرات ذات الصلة: معدات الطحن, معدات فصل المعادن و مرافق التصنيع فانور.

أدوار المعدات عبر الخط

مسؤوليات المعدات والعمليات
منصةمعداتدور العملية
تحضير الخامركوب كسارة, cone crusher and معدات الفحصPrepare a controlled grinding feed.
طحنWet ball millReduce particle size before mineral separation.
تصنيفPre-classification screen and hydrocyclone groupControl the grinding stream ahead of flotation.
الانفصالFlotation equipmentProvide roughing, scavenging and cleaning stages.
Concentrate handlingThickener and filter pressRemove water from the flotation concentrate.

Discuss Your Copper Processing Requirements

مشاركة خصائص خام الخاص بك, الإنتاجية اليومية, الاختبار المتاح ونطاق المعدات المطلوبة. تساعد هذه التفاصيل فريقنا على مراجعة عملية الطحن, مراحل الانفصال والدعم لمشروعك.

بريد إلكتروني: info@vanoremining.com
واتساب: +86 18703806100

الاسم الكامل