1,500 t/d Proyecto de procesamiento de cobre en Mongolia

Project cases / 1,500 t/d Proyecto de procesamiento de cobre en Mongolia

The Mongolia copper-ore project is configured for 1,500 tonnes per day. Its process connects staged crushing and screening with wet grinding, clasificación, flotation and concentrate dewatering, keeping ore preparation and mineral separation within one processing route.

Project Configuration

Material, throughput and process arrangement
LocationMongolia
MaterialCopper ore
Project configuration1,500 t/day
Grinding arrangementWet grid-type ball mill with classification
Separation routeFlotación
Concentrate handlingThickening followed by filter-press dewatering

Processing Stages

1. Crushing and screening

Jaw and cone crushing reduce the ore, with screening controlling the material sent forward to grinding.

2. Wet grinding and classification

A wet grid-type ball mill works with pre-classification and a hydrocyclone group. The classification section controls the grinding stream before flotation.

3. Flotación

The flotation arrangement includes roughing, scavenging and cleaning duties. These stages separate copper-bearing material from the prepared slurry.

4. Concentrate dewatering

Thickening forms the first concentrate-dewatering stage. Filter pressing then produces a filter cake for subsequent handling.

Project Equipment

Personnel inspecting the gear and drive side of an industrial grinding mill
Drive-side inspection of grinding equipment.

The grinding section cannot be evaluated independently of the flotation feed it produces. In this configuration, classification connects particle-size reduction with mineral separation, while the thickener and filter press handle the concentrate after flotation.

Related capabilities: Grinding equipment, equipos de separacion de minerales and the Vanore manufacturing facilities.

Equipment Roles Across the Line

Equipment and process responsibilities
EscenarioEquipoProcess role
Ore preparationpaseo trituradora, cone crusher and screening equipmentPrepare a controlled grinding feed.
MoliendaWet ball millReduce particle size before mineral separation.
ClasificaciónPre-classification screen and hydrocyclone groupControl the grinding stream ahead of flotation.
SeparationFlotation equipmentProvide roughing, scavenging and cleaning stages.
Concentrate handlingThickener and filter pressRemove water from the flotation concentrate.

Discuss Your Copper Processing Requirements

Share your ore characteristics, daily throughput, available testwork and required equipment scope. These details help our team review the grinding, separation and supporting stages for your project.

Correo electrónico: info@vanoremining.com
WhatsApp: +86 18703806100

Nombre completo